From February 5, 2019, until now, which equals 2 165 days, there have been 1 checks done on dazz.la's accessibility. 1 times, including on February 5, 2019, with a 200 status code, dazz.la's operability was confirmed through checks conducted. There were no observed offline periods for dazz.la based on all checks made as of January 10, 2025. As of January 10, 2025, the error-free status of each response that was received has been confirmed.